Experimentation in the Real World Part 2 of 3

Fixed-power designs: How much data do we really need?

We normally use historical data to estimate how many observations an experiment needs.

Shan Islam

In Part 1, I discussed a six-week checkout experiment with an early positive signal. But what if the original six-week estimate was wrong? We normally use historical data to estimate how many observations an experiment needs. The actual experiment may turn out to be more or less noisy than expected.

What I find interesting about fixed-power designs

One assumption we make when planning an experiment is that historical data provides a reasonable estimate of the variability we expect. What happens if that assumption is wrong?

Spotify researchers Mattias Nordin and Mårten Schultzberg proposed fixed-power designs, which use accumulating outcome data to assess the required sample size. The MDE, target power and significance level stay fixed; the estimated variance and required sample size may change.

For an equally allocated two-arm experiment, a simplified normal-approximation calculation is:

nrequired=σC2+σT2δ2×(z1−α/2+z1−β)2\begin{aligned} n_{\mathrm{required}}&=\frac{\sigma_C^2+\sigma_T^2}{\delta^2}\\ &\quad\times(z_{1-\alpha/2}+z_{1-\beta})^2 \end{aligned}

Here nn is the sample size per arm, δ\delta is the absolute MDE, and the two variances describe the outcomes in control and treatment. For binary conversion, σg2=pg(1−pg)\sigma_g^2=p_g(1-p_g).

Suppose the historical seven-day conversion rate is 24%, the MDE is 2.4 percentage points, alpha is 5% and target power is 80%. Assuming the historical variance in both groups gives about 4,971 customers per arm.

In a fixed-power design we update the variance estimates from mature outcomes in each arm and stop when:

nmature≥n^requiredn_{\mathrm{mature}}\geq\widehat n_{\mathrm{required}}

subject to the other planned completion criteria. The absolute MDE remains 0.024 throughout; we don’t redefine it using the observed uplift or the changing baseline.

The distinction is that the stopping rule is based on estimated precision, not whether the treatment is winning. Under the conditions in the paper, standard non-sequential confidence intervals retain nominal coverage asymptotically. The authors also discuss conservative finite-sample alternatives.

What happens when our historical estimate is wrong?

In another simulation, I held the absolute MDE constant at 2.4 percentage points but varied the actual underlying conversion rate. Each scenario was repeated 100,000 times. I inspected mature outcomes every 250 customers per arm, with a minimum of 1,000 per arm for fixed-power stopping.

Actual control conversionFixed sample powerFixed-power powerMean fixed-power sample per arm
10%96.8%81.6%2,824
24%79.0%81.0%5,252
40%68.5%80.9%6,750
Statistical power by baseline conversion rate100,000 simulations per scenario; dashed line marks the 80% target.
Statistical power by baseline conversion rate0%25%50%75%100%96.8%81.6%10%79%81%24%68.5%80.9%40%Baseline conversion rateStatistical power by baseline conversion rate0%25%50%75%100%96.8%81.6%10%79%81%24%68.5%80.9%40%Baseline conversion rate
Chart data
ScenarioFixed sampleFixed power
10% baseline96.8%81.6%
24% baseline79%81%
40% baseline68.5%80.9%
Sample size per arm across baseline ratesFixed sample: 5,000 per arm. Fixed-power figures are mean samples; absolute MDE stays at 2.4 percentage points.
Sample size per arm across baseline rates03,5007,00010% baseline5,0002,82424% baseline5,0005,25240% baseline5,0006,750Customers per armSample size per arm across baseline rates03,5007,00010% baseline5,0002,82424% baseline5,0005,25240% baseline5,0006,750Customers per arm
Chart data
ScenarioOriginal fixed sampleMean fixed-power sample
10% baseline5,000 customers2,824 customers
24% baseline5,000 customers5,252 customers
40% baseline5,000 customers6,750 customers

The fixed comparison used 5,000 customers per arm. Fixed-power stopping shortened or lengthened the experiment according to the underlying variance. It isn’t necessarily a way to finish sooner; it is a way to better target the information requirement.

How would this look during an experiment?

Suppose we review our mature seven-day conversion outcomes at three checkpoints. The estimated information requirement changes as the variance estimate improves.

CheckpointMature customers per groupEstimated requirement per groupDecision
12,0004,356Continue
24,7004,966Continue
35,2005,104Information target reached
Mature sample versus estimated requirementIllustrative checkpoints per group. The information target is reached at checkpoint 3.
Mature sample versus estimated requirement02,5005,00012,0004,35624,7004,96635,2005,104Target reached at 3CheckpointMature sample versus estimated requirement02,5005,00012,0004,35624,7004,96635,2005,104Target reached at 3Checkpoint
Chart data
ScenarioMature sampleEstimated requirement
Checkpoint 12,000 customers4,356 customers
Checkpoint 24,700 customers4,966 customers
Checkpoint 35,200 customers5,104 customers

These figures are illustrative. Completion still depends on the planned minimum duration, outcome maturity and any other requirements specified upfront.

In the null scenario at a 24% baseline, the simulation also gave a 5.1% false positive rate for fixed-power stopping, compared with 5.1% for a single fixed-sample test and 25.2% for repeated unadjusted tests. This is not a proof of general validity; it illustrates the distinction between stopping on the estimated information requirement and stopping on significance.

Final thoughts

I particularly like the idea of committing to a level of statistical sensitivity rather than an initially estimated number of customers. It is useful when historical data does not accurately describe the population or treatment.

Fixed-power design doesn’t itself provide an early efficacy decision rule. In Part 3, I explore how we might design for early commercial action while retaining a meaningful final comparison.